One 7’-0” Diameter x 24’-6” high silver Delta Cooling air stripping tower installed to treat potable water at the Well #1 Pump Station Water Treatment Plant.  Green full trees in the background with a crystal blue sky.
Site Location: Danvers, Massachusetts
Process Design: 600gpm, 82% Xylene Removal, 76% MTBE Removal, 95.0% TCE Removal, 93% Benzene Removal, Tolulene Removal, 95% CO2 Removal 
Equipment: (1) Model ΔS7-120RAC

Delta Cooling Towers, Inc. designed and fabricated (1) One 7’-0” Diameter x 24’-6” high air stripping tower to treat potable water at the Well #1 Pump Station Water Treatment Plant in Danvers, MA.  The air stripper shell was fabricated from Aluminum and lined with an NSF Epoxy.  The tower was supplied with a centrifugal blower designed to produce 18,720cfm at 4.5” w.c.  The blower is rated at 20hp, and was supplied with an air filter assembly and intake louver to prevent the entry of contaminants into the air stripper.  Delta also designed and fabricated the OSHA ladder and platform assemblies for ease of periodic inspection of the tower internals and packing media.

One 10’-0” Diameter x 30’-6” high Silver Stainless Steel Delta Cooling air stripping tower to treat potable water at the Water Treatment Facility.  The tower is surrounded by a metal fence, next to a building with some trees to the side. The background has blue skies with no clouds.
Site Location: Shrewsbury, Massachusetts
Process Design: 2,100gpm, 95.0% VOC Removal
Equipment: (1) Model ΔS10-200RSS

Delta Cooling Towers, Inc. designed and fabricated a 10’-0” Diameter x 30’-6” high air stripping tower to treat potable water at the Water Treatment Facility for The Shrewsbury Water Department in Shrewsbury, MA.  This tower was installed as the First Phase of the replacement of two existing towers at this facility.  The air stripper shell was fabricated from Stainless Steel.  The tower was supplied with a centrifugal blower designed to produce 4,180cfm at 5.0” w.c.  The blower was rated at 5.0hp, and was supplied with air filter assemblies and intake louvers to prevent the entry of contaminants into the air stripper.  All of the tower internals were factory installed by Delta simplifying the installation process.  The media was installed at our factory prior to shipment to minimize the installation time.

 One 9’-7” Diameter x 38’-0” high Delta Cooling Tower air stripping tower to treat potable water at the Riverneck Road Water Treatment Plant in Massachusetts. The tower is next to a building with striped bricks alternating red and beige. There are green trees and grass surrounding the tower.
Site Location: Chelmsford, Massachusetts
Process Design: 2,100gpm, 99% PCE Removal, 99.0% TCE Removal, 99.0% Vinyl Chloride Removal 
Equipment: (1) Model ΔS9-5-260RAC

Delta Cooling Towers, Inc. designed and fabricated (1) One 9’-7” Diameter x 38’-0” high air stripping tower to treat potable water at the Riverneck Road Water Treatment Plant in Chelmsford, MA.  The air stripper shell was fabricated from Aluminum and lined with an NSF Epoxy.  The tower was supplied with a centrifugal blower designed to produce 11,230cfm at 4.5” w.c.  The blower is rated at 10hp, and was supplied with an air filter assembly and intake louver to prevent the entry of contaminants into the air stripper.  Delta also designed and fabricated the OSHA ladder and platform assemblies for ease of periodic inspection of the tower internals and packing media.

One 10’-0” Diameter x 30’-0” high silver Delta Cooling Towers air stripping tower to treat potable water at the Springvale Water Treatment Facility. The air stripper was installed next to three additional silver towers. The towers are next to a brick building with trees and blue sky.
Site Location: Natick, Massachusetts
Process Design: 2,100 gpm, 95.0% PCE Removal, 95.0% TCE Removal, 85.0% Cis-1, 2-DCE Removal
Equipment: (1) Model ΔS10-170RAC

Delta Cooling Towers, Inc. designed and fabricated (1) One 10’-0” Diameter x 30’-0” high air stripping tower to treat potable water at the Springvale Water Treatment Facility in Natick, MA.  The air stripper shell was fabricated from Aluminum and lined with an NSF Epoxy.  The tower was supplied with a centrifugal blower designed to produce 10,230cfm at 3.5” w.c.  The blower is rated at 10hp, and was supplied with an air intake assembly to prevent the entry of contaminants into the air stripper.  All of the tower internals were factory installed by Delta simplifying the installation process. 

 One 7’-6” Diameter x 36’-1” high silver Delta Cooling air stripping tower and (1) 8’-6” Diameter x 36’-1” high air stripping tower to treat potable water.  The tower was installed by a small yellow building with green trees and blue sky in the background.
Site Location: Vineland, New Jersey
Process Design: 1,800 gpm (well #2 and #3), 99.0% PCE Removal, 1,000 gpm (well #5) 95.0% MTBE Removal, 99.5% Benzene Removal
Equipment: (1) Model ΔS7.5-250RAC, (1) Model ΔS8.5-250RAC, Air Stripper Tower

Delta Cooling Towers, Inc. designed and fabricated (1) One 7’-6” Diameter x 36’-1” high air stripping tower and (1) 8’-6” Diameter x 36’-1” high air stripping tower to treat potable water at the Well #2/3 and Well#5 sites in Vineland, NJ.  The air stripper shells were fabricated from Aluminum and lined with an NSF Epoxy.  The Well #2/3 tower was supplied with a 7.5hp blower rated for 6,020cfm @ 4.1” W.C.    The Well #5 tower was supplied with a 50hp blower rated for 23,400cfm at 9.0” W.C. The blowers were supplied with air filter assemblies and intake louvers to prevent the entry of contaminants into the air strippers.  All of the tower internals were factory installed by Delta simplifying the installation process.  Delta also designed and fabricated the OSHA ladder and platform assemblies for ease of periodic inspection of the tower internals and packing media.

One additional 10’-0” Diameter x 30’-6” high white Delta Cooling air stripping tower was installed to treat potable water at the Water Treatment Plant.  There are three additional white towers in the background with yellow platforms on the sides of each tower.
Site Location: City of Stuart, Florida
Process Design: 6,000 gpm, 98.6% TCE Removal
Equipment: (4) Model ΔS10-205RF, Air Stripper Towers

Delta Cooling Towers, Inc. has recently delivered and started up the fourth unit at the City of Stuart, FL.  We designed and fabricated (1) one additional 10’-0” Diameter x 30’-6” high air stripping tower to treat potable water at the Water Treatment Plant in Stuart, FL.  The air stripper shell was fabricated from NSF Approved FRP.  The tower was supplied with a centrifugal blower designed to produce 16,000cfm at 4.0” w.c.  The blower is rated at 20hp, and was supplied with air filter assemblies and intake louvers to prevent the entry of contaminants into the air stripper.  All of the tower internals were factory installed by Delta simplifying the installation process.  Delta also supplied the Packaged Chemical Cleaning System pictured above.

Four 10’-0” Diameter x 34’-0” high air stripping towers were designed and fabricated by Delta Cooling Towers, Inc. to treat potable water at the Water Treatment Plant in Delray Beach, Florida. There is a bridge connecting  the four towers with a yellow box in front with green grass and blue skies with white clouds.

Site Location: Delray Beach, Florida
Process Design: 6,000 gpm, 99.5% PCE Removal
Equipment: (1) Model ΔS10-170RAC

(4) Four 10’-0” Diameter x 34’-0” high air stripping towers were designed and fabricated by Delta Cooling Towers, Inc. to treat potable water at the Water Treatment Plant in Delray Beach, FL.  The air stripper shells were fabricated from FRP.  Each tower was supplied with a centrifugal blower which was designed to produce 11,500cfm at 4.0” w.c.  The blowers are rated at 20hp each, and were supplied with air filter assemblies and intake louvers to prevent the entry of contaminants into the air stripper.  All of the tower internals were factory installed by Delta simplifying the installation process.  Delta also designed and fabricated the OSHA compliant ladder and platform assemblies to facilitate the periodic inspection of the tower internals and packing media.

Delta designed, fabricated, and delivered (2) two 4’-0” Diameter x 35’-0” high air stripping towers to treat the contaminated water with each tower containing Delta Pak structured packing. The photo looks old with gray skies and trees in the back. The two towers are next to a beige building with brown mud around it.
Site Location: Momence, Illinois
Process Design: 240 gpm, 99+% Removal of Multiple VOC's
Equipment: (2) Model ΔS4-250F Air Stripper Towers

Delta Cooling Towers, Inc. was contracted by the owner to treat multiple VOC’s in a flow stream of 240 gpm at their recycling plant in Illinois.  Delta designed, fabricated, and delivered (2) two 4’-0” Diameter x 35’-0” high air stripping towers to treat the contaminated water.  Each tower contains 25’-0” of Delta-Pak® structured packing.  The towers were supplied with centrifugal blowers designed to produce 2,600cfm at 2.75” w.c.  The blowers are rated at 7.5hp each, and installed in a blower building adjacent to the towers.  All of the tower internals were factory installed by Delta to expedite the installation process.

Delta Cooling Towers, Inc. designed and fabricated (2) two 4’-0” Diameter x 40’-0” high air stripping towers to treat water at the Water Treatment Plant in Clinton, Iowa. The two white towers are indoor with red pipes. There is a yellow connecting the two with one tower having a ladder on the side of one.
Site Location: Clinton, Iowa
Process Design: 250 gpm, 99+% Removal of Multiple VOC's
Equipment: (2) Model ΔS4-350F Air Stripper Towers

Delta Cooling Towers, Inc. designed and fabricated (2) two 4’-0” Diameter x 40’-0” high air stripping towers to treat water at the Water Treatment Plant in Clinton, Iowa.  The air stripper shell was fabricated from FRP and contained 35’-0” of 3 1/2”diameter Jaeger Tri-Packs®.  Each tower was supplied with a centrifugal blower was designed to produce 1,800cfm at 3.75” w.c.  The blowers are rated at 7.5hp each, and were supplied with air filter assemblies and intake louvers to prevent the entry of contaminants into the air stripper.  All of the tower internals were factory installed by Delta to expedite the installation process.  Delta also designed and fabricated the OSHA ladder and platform assemblies for ease of periodic inspection of the tower internals and packing media.

 Delta Cooling Towers, Inc. designed and fabricated (2) two 4’-0” Diameter x 40’-0” high air stripping towers to treat water at the Water Treatment Plant in Clinton, Iowa. The two white towers are indoor with red pipes. There is a yellow connecting the two with one tower having a ladder on the side of one.
Site Location: Wichita, Kansas
Process Design: 750 gpm, 98.3% TCE Removal, 76.7% CIS Removal
Equipment: (2) Model ΔS9-300F Air Stripper Towers

(2) Two 9’-0” Diameter x 40’-0” high air stripping towers were designed and fabricated by Delta Cooling Towers, Inc. to treat TCE contaminated water at the Cessna Aircraft Company’s factory in Wichita, KS.    Each tower was supplied with a centrifugal blower was designed to produce 8,500cfm at 4.25”w.c.  The blowers are rated at 20hp each, and were supplied with air intake screens to prevent the entry of contaminants into the air stripper.  All of the tower internals were factory installed by Delta in our factory prior to shipment to expedite the installation process.

 

 

 